Laser measurement project brief LDS Optical Metrology Revision: 2026-11-08 Blank planning worksheet for an engineering enquiry. This is not a product specification, wiring drawing, calibration report or certificate. Fill and save locally, or print and write. Nothing is submitted automatically. Agree an NDA and transfer method before sending confidential information. Project and contact reference Company/project reference and the reply contact you choose to provide. Response: ____________________ Quantity to measure and required result Point height, total thickness, coating-only change, profile/gap or travel distance; datum and units. Response: ____________________ Requested family and existing equipment LDS inquiry reference if known; original head, controller, gateway and cable part numbers. Response: ____________________ Nearest/farthest distance and measuring span State both limits and units, mounting space and optical clearance; include any approach below 1 m. Response: ____________________ Target surface, layers and temperatures Material/finish, opaque or transparent stack, hot target versus sensor ambient, light/dust/steam. Response: ____________________ Motion, acquisition and synchronization Line speed, flutter/tilt, fresh-reading rate, trigger/encoder, exposure/filtering and latency budget. Response: ____________________ PLC or PC interface and result format Controller model; exact analog/digital protocol; units, status flags, timestamps and data-loss behavior. Response: ____________________ Mechanical drawing and installation review Drawing revision, mounting datum, connector/cable access, frame, reflector and protective housing. Response: ____________________ Electrical and communication review Supply, model-specific pin assignment, analog load/scaling, register/process map and firmware revision. Response: ____________________ Documents to request STEP/drawing; clearance; M12 pinout; analog/Modbus map; fieldbus/SDK; calibration; safety/environment. Response: ____________________ Reference artifact and calibration scope Reference identity/uncertainty, points/span, fixture and environmental conditions, report identity. Response: ____________________ Acceptance method and decision rule Tolerance and uncertainty treatment, repeat/reload tests, difficult surfaces and invalid-data coverage. Response: ____________________ Supply scope, quantity and destination Heads/systems, frame/controller responsibility, sample/annual quantities, country and desired schedule. Response: ____________________ Open questions and confidentiality Unconfirmed requirements and document revisions; NDA/transfer needs. Avoid confidential details until agreed. Response: ____________________ Send an agreed non-confidential brief to inquiry@laserdisplacement.com